
Projects
Draft Animal Control Bylaw
Project: Draft Animal Control By-law Review
Comments will be accepted until April 3, 2023 at 4:00 p.m..
Please email cmiller@whitewaterregion.ca if you have comments.
A report with a final Draft Animal Control By-law will come forward at a later meeing for Council to review.
County Road 7 (Foresters Falls Road) Rehabilitation
Project Description
Township of Whitewater Region has partnered with the County of Renfrew for the rehabilitation of County Road 7 (Foresters Falls Road) within the urban section of Forester Falls.
The scope of work that is being...
LED Street Light Conversion
The Township of Whitewater Region has approximately 400 streetlights located throughout the municipality in the following communities:
Forester Falls
Haley Townsite
Haley Station
Westmeath
Springfield
Cobden
Industrial...
Olmstead-Jeffrey Lake Road Rehabilitation
Project Description
The project includes 7.2km of Olmstead-Jeffrey Lake Road from Highway 17 to Magnesium Road (County Road 48) and 0.2km of Acres Road.
The construction project consists of grading, replacement of the hard surface,...
Pappin Road Rehabilitation
Project Description
Project limits: Pappin Road from Beachburg Road (County Road 21) to Zion Line.
The 2.5km rehabilitation project scope of work consists of the following:
Removal of double surface treatment
Culvert...
Sturgeon Mountain Road Rehabilitation
Project Description
Project limits: Sturgeon Mountain Road from Beachburg Road (County Road 21) to Zion Line.
The 1.05km rehabilitation project scope of work consists of the following:
Removal of double surface treatment
Culvert...
Wellhead Protection Areas (WHPA)

The Township of Whitewater Region supplies municipal water drinking water to residents in Cobden, Beachburg and Haley Townsite. Groundwater aquifers are the water supply source for the residents in Beachburg and Haley Townsite and a local surface water body is the water supply source for Cobden.
Zion Line Rehabilitation
Project Description
Project limits: Zion Line from Beachburg Road to Hila Road.
The 3.2km rehabilitation project scope of work consists of the following:
2022
Removal of double surface treatment
Culvert replacement
Ditching and...